Scope of the build
Fixed scope, fixed timeline, 100% U.S.-based senior engineers on Eastern-time hours.
- Delivery cadence, planning and reporting to the exec team
- Architecture review and technical decision records
- Hiring loop design and interviewing
- Vendor and contractor oversight
- Incident process and on-call setup
- Monthly written state-of-engineering to leadership
What you get
Predictable delivery
Dates the exec team can actually plan against.
Better hires
Structured loops instead of gut-feel interviews.
No lock-in
Month to month after the first quarter.
Where this fits
- → Between VPs of Engineering
- → First scaling stage
- → PE-backed operational reset
- → Post-acquisition integration
From signature to production
The same delivery rhythm on every engagement. You always know what shipped last week and what ships next.
- Week 0
Scope lock
Two working sessions with your team. We write the spec, the acceptance criteria, and the integration list, then fix the price against it.
- Weeks 1-2
Spine first
Data model, auth, environments, CI, and the riskiest integration go in before any screen is polished. You see it running in staging.
- Mid-build
Weekly demo
Working software every Friday, on your staging environment. Scope changes get priced in the same call, never discovered at the end.
- Go-live
Handover that holds
Runbooks, monitoring, test suite, and a recorded walkthrough for your engineers. You own the repo and the accounts from day one.
Before you book a call
Straight answers on price, timeline, ownership, and who writes the code. If your question is not here, ask it on the call — we answer it the same way.
Scope fractional engineering leadership →What does fractional engineering leadership cost?
From $18,000/month. The price is fixed against a written scope after a two-session discovery, so the number you approve is the number you pay. Typical delivery runs 3-month minimum.
How long does it take to go live?
3-month minimum from scope lock to production for the scope listed on this page. You see working software in your staging environment every week, starting in week two.
What does it integrate with?
Out of the box we wire Jira / Linear, GitHub, PagerDuty and Notion. Anything with an API or a file drop can be added during scope lock.
Who actually builds it?
Senior U.S.-based engineers on Eastern-time hours. No offshore handoff, no rotating junior bench. The people on your kickoff call are the people writing the code.
Do we own the code?
Yes. Your repo, your cloud accounts, your data — from the first commit. We hand over runbooks, tests, monitoring, and a recorded walkthrough so your team can take it forward without us.
Can this start smaller than the full scope?
Usually. We can carve a first slice that proves the hardest part of fractional engineering leadership in a few weeks, then sequence the rest once it is running in production.
Related case studies
- Building a Cutting-Edge Website for Inventive Adv Case StudyInventive Advisors is a forward-thinking consulting firm that helps businesses drive innovation and performance through data-backed strategies. To reflect.
- Trademark Waste Solutions Case StudyTrademark Waste Solutions (TMW) supports commercial, industrial, and multifamily clients by reviewing hauler invoices, validating service accuracy.

